Posted on: March 21, 2017 Posted by: admin Comments: 0

this year, in addition to Baoziwan town of new rural construction tasks completed as planned Yan Village integration of urban and rural development objectives and the district government issued Tao Nan Zhu Nan, seven villages, three villages (I Zhen Jin Jia Wan, Tao Bei, waves) in the absence of undertake the task of building the case. In accordance with the general requirements of the goals of the new rural construction, and actively guide by the town government, village cadres leadership attaches great importance to actively cooperate with the broad participation of the masses, according to the actual village trying to raise funds, increase rural village renovation and infrastructure investment, promote the new rural construction project.
the main construction contents are: one is the Jin Jia Wan Village a total investment of 7 million 120 thousand yuan, completed 4.5 km village road hardening, greening 3 km, the new cultural plaza two 6000 square meters, built channels (the main canal of 600 meters, or 4.5 km), water pipe network transformation (Sheung Shui 5.6 kilometres of water 7 km) in a sewage treatment station, power line, 4.5 kilometers, the new cultural compound a 3000 square meters; two Tao Bei Cun is a total investment of 561 thousand yuan, the new village comprehensive service center of a two storey steel mixed structure of 260 square meters, the construction of rural landscape (six corner Pavilion) a building, the culture show a street, the installation of 14 solar street lights, etc. three is accelerating the construction of new countryside; Lang village a total investment of 620 thousand yuan, completed the installation of 90 solar street lamp, cultural square fence 1300 square meters, 700 meters water maintenance, planting trees 300 More than 690, closed circuit TV line maintenance, a new parking lot of 2670 square meters. The cumulative total investment of 8 million 301 thousand yuan.

 

Leave a Comment